Walkway from Flux

Those who were having lunch at the Gemini cafeteria could see the walkway from Flux only has a few meters left to go. We’ll still have to wait until 2015 before we can use the main connection on the first floor between FLUX and the rest of the buildings at TU/e, though.

Share this article